Incident Protocol: Site-96
Wiki Article
The following log details the Site96 termination procedures undertaken at Site-96 on cycle 437. The primary objective of the operation was to contain a subject classified as Safe designation. Initial reports indicate that the termination protocol was successful with minimal collateral damage. Subject containment breach occurred at approximately time. Further investigation into the incident's cause is ongoing.
- Key contributors to termination process: Dr.Last Name Redacted, Dr.Last Name Redacted, AgentID number Redacted.
- Primary tools utilized in termination:: M-Class weaponry, sensory disruptor.
Further details regarding the incident are currently classified.
Euclid Containment Breach - Site 96
On 08/15/XXXX| During midday, an anomaly occurred at Site 96, resulting in the breach of Euclid-class entity SCP-YYY. Initial reports indicate system malfunction as the primary cause. Security personnel were immediately dispatched to the affected area and engaged in a tactical evacuation.
- The breached entity exhibited uncharacteristic aggression, posing a potential threat to surrounding infrastructure and personnel.
- Initial containment protocols were implemented with varying degrees of success. Further investigation into the cause of the breach is ongoing, with on-site technicians currently at work.
- Information blackout| The Foundation has issued a temporary site lockdown order.
Unit Delta-7: : Site Ninety Six Protocol Engaged
A hostile force has been detected within the perimeter. All personnel are to immediately evacuate and await further instructions.
Unit Delta-7 is to initiate {Site Ninety Six Protocol{ immediately. All resources are to be deployed as needed.
- Preserve radio silence unless absolutely necessary.
- Report all occurrences immediately.
- Remain vigilant at all times. This is a level 5 emergency.
Site-96 Anomaly Analysis Summary
A comprehensive examination of the anomalous phenomena at Site-96 has been completed. The primary findings indicate a complex and dynamic system exhibiting properties consistent with non-Euclidean activity. Supplemental research is required to elucidate the nature and goal of this anomaly.
- Key findings:
- Persistent energy fluctuations
- Displaced coordinates
- Undecipherable signals
Proposed actions include further observation of the site and implementation of a dedicated research team. Emergency response plans should be reassessed to reflect the evolving characteristics of this anomaly.
Perimeter Security Protocol: Site 96 Activation
A full lockdown has been instated within Secure Zone Alpha-2, specifically at Site 96. All personnel are to stay to designated safe areas and cease all non-essential functions. External access to the site has been fully restricted. Any unauthorized persons attempting to breach the perimeter will be handled according to protocol.
Intelligence gathered points towards a potential threat. The situation is being carefully assessed by security forces, and updates will be issued as they become available.
Remain calm, follow all instructions from authorized personnel, and cooperate fully with the ongoing investigation.
Inquiry into Anomalous Signal Originating from Site-96
Preliminary evaluation of the anomalous signal detected at Site-96 indicates a likely source originating from deep within the structure. The signal, characterized by irregular fluctuations in electromagnetic range, has exhibited distinct intensity surges at specific wavelengths. Efforts are currently underway to isolate the exact source of the signal and determine its character. A squad of specialist researchers, including cryptographers, physicists, and specialist scientists, have been deployed to Site-96 to conduct a thorough examination.
- Initial findings suggest the signal may be man-made, though further research is required for verification.
- Security protocols at Site-96 have been tightened in light of the anomalous phenomenon.
- Access to the site is currently limited to authorized personnel only.